An early project where two things met: designing the control elements, and building the prototypes used to test them.
Control panels for microwaves, built on screen to test them. The same prototypes later replaced the trip to Japan.
In an industrial design office, the team designed microwaves for Matsushita, Panasonic’s parent company. My work was the control elements. We built them on screen first, as prototypes, to check the operating logic before a physical model existed.


Those same digital panels then carried the presentation: on a CD-ROM, the decision-makers in Japan could view the operating concepts and work with them, instead of someone flying over. Built to test; used to convince.

